Bathroom Renovations

Thinking of Renovating your Bathroom?
Call the Bathroom Renovation Specialists of Forster/Tuncurry

On Time as Promised!

We breath life into old, worn-out bathrooms!
Check out some of our bathroom design ideas right here.

CONTACT US TO DISCUSS YOUR DREAM BATHROOM TODAY
(02) 6555 3484

HOW LONG DOES A BATHROOM RENOVATION TAKE?

The bathroom renovation process usually takes between four to five weeks. The process is often a bit slower during the winter as the weather tends to slow down the drying times.

The waterproofing and sand cement bed all need to fully cure before moving to the next stage.

Shower screens take up to 10 days to be ordered and installed. They can’t be ordered until the wall tiles are installed so that we can take accurate measurements. All of these contribute to the duration of the renovation.

WHAT AFFECTS THE COST OF MY BATHROOM RENOVATION?

There are several factors that affect the cost of the project. They include:

  1. How much of the old internal linings will need to be replaced?
  2. Will the doors, jambs, or windows require replacing?
  3. How much painting will need to be done?
  4. Is the bathroom on a slab or timber floor?
  5. Is there asbestos?
  6. Does the plumbing need to be relocated or completely replaced?
  7. Is the timber floor still in good condition, or is it roed or damaged by termites and moisture?
  8. Do you want underfloor heating?
  9. Is there a need for some extensive electrical work?
  10. What are the prices of your preferred tiles and other inclusions?
  11. How high are you planning to tile?
  12. What is the level of access to the room from the driveway? In situations where there is a considerable distance or difficulty, the price will vary.

HOW MUCH DOES A RENOVATION COST?

Generally, a small ensuite can cost between $18,000 and $22,000 for a full renovation and redesign. A standard bathroom can cost between $22,000 to $30,000.

Check out the size of our team required for a Bathroom renovation.

I. Carpenters
ii. Plumbers
iii. Electricians
iv. Plasterers
v. Carpet layers for when the room is adjacent to carpeted areas
vi. Painters
vii. Tilers
viii. Waterproofers
ix. Shower screen and mirror installers

Our team is made up of the best with decades of combined experience in bathroom renovations.

TAKE A TOUR

A picture tells a thousand words; a video tells lots more …
Take a peek at these stunning bathroom renovations and remodelling in Forster Tuncurry NSW.

WANT TO TURN YOUR TIRED BATHROOM INTO SOMETHING MORE BEAUTIFUL?
CALL US NOW TO DISCUSS YOUR BATHROOM RENOVATION IDEAS

(02) 6555 3484

PLANNED APPROACH

We take a planned approach to all our bathroom renovations which keeps you involved at every step, to ensure you are delighted with the end result.

Our experience covers small bathroom renovations, to luxurious open-spaces, giving the same thought and attention to detail for all our building renovation projects.

From initial discussions about bathroom design, agreement on works to be conducted, formal contracts, accessibility to your home, respect for your neighbours, start date, completion date, management of variations, including you in critical decisions, introducing you to our suppliers personally, giving you lots of advice and communicating regularly through to seeing your smiling face; our objective is seeing your delight!

CALL US TODAY TO DISCUSS YOUR BATHROOM RENOVATION
(02) 6555 3484

BATHROOM INSPIRATION

Browse through our gallery of bathroom renovations to help inspire your new bathroom design!

WE ARE NOT JUST ABOUT DOING THE WORK FOR YOU, WE DO EVERYTHING WITH YOU AS A MEMBER OF YOUR TEAM!

BEFORE AND AFTER

The pictures below show how we have transformed bathroom spaces. Small bathroom designs, large luxury bathroom designs and bathroom renovations on a budget – we can help you along the bathroom renovation journey.

Just imagine the changes we could make to your bathroom!

Before

After

DUST MANAGEMENT

Renovating a bathroom can be a very messy job. We know that, and we will take every precaution to make sure we do not fill your home with dust and dirt. No dust and dirt means a healthier environment and happier family. It can even save the costs of moving out whilst work is under way!
Check out these videos that show our dust extraction equipment at work.

CONTACT US NOW FOR A BATHROOM RENOVATION QUOTE. WE BELIEVE WE ARE THE BEST BATHROOM RENOVATION BUILDERS IN THE FORSTER/TUNCURRY AREA.

COMMON QUESTIONS:

CAN I LIVE IN MY HOME WHILE THE RENOVATION IS TAKING PLACE?
WHAT HAPPENS IF WE DON’T HAVE ANOTHER WC OR BATHROOM?
WHAT KIND OF WARRANTY DO I GET?
WHO WILL BE IN CHARGE AND HOW WILL WE COMMUNICATE?
WHAT IS A VARIATION?
WHAT KIND OF DOCUMENTS WILL I RECEIVE WHEN THE PROJECT IS DONE?
CAN I LIVE IN MY HOME WHILE THE RENOVATION IS TAKING PLACE?

Of course, you can! From experience, this usually isn’t a problem. Clients will usually stay in the home while we renovate. Sometimes they choose to go away for a week or two to avoid the mess. If it is an ensuite, we like to have the main bedroom vacated and fully covered with drop sheets and black plastic. The first week of the renovation is usually the most challenging; after which, there is very little dust.

WHAT HAPPENS IF WE DON’T HAVE ANOTHER WC OR BATHROOM?

This can be a problem when there isn’t another bathroom in the house. We have had occasions where the client has hired a site WC. You can rent a small mobile bathroom mounted on a trailer. You will be without a WC for 2-3 weeks while we do the renovation if you don’t have a second toilet, renting one is necessary to ensure the experience is as stress-free as possible. This needn’t be a nightmare; it needs to be exciting!

WHAT KIND OF WARRANTY DO I GET?

We provide a 7-year warranty on the waterproofing. All the other products that will be installed come with warranties. You also have the security of knowing that we have been in the business of executing excellent bathroom renovations for over thirty years in the Forster Tuncurry Great Lakes area.

WHO WILL BE IN CHARGE AND HOW WILL WE COMMUNICATE?

We understand the importance of seamless communication; you can be sure that we will keep you well informed throughout the project. Our Site Foreman and Steve are both available during the day. You will also be able to reach us via messages, emails, and phone calls. We will endeavour to let you know who will be on-site next and when we will need access. This allows you to be able to go about your daily activities with minimal disruption. To facilitate a seamless process from start to finish, we use Buildxact, a project management software, to help keep every job on schedule.

WHAT IS A VARIATION?

Variations are used when the scope of work changes and/or the value of the inclusions change. They can potentially lead to delays in the schedule, but that is no problem for us to manage. Variations will be issued from our software and sent to you for approval via email. Variations will be subject to a 20 % builders’ margin.

WHAT KIND OF DOCUMENTS WILL I RECEIVE WHEN THE PROJECT IS DONE?

You will receive copies of the waterproofing certificate and warranty issued by Dazco Waterproofing. They are a local company and our preferred installer. We generally have professional photos taken of the completed project, which we will share with you. These are always a great thing to have to show your friends and family.

CLIENT TESTIMONIALS

OUR STEP BY STEP PROCESS

1. Initial call or contact

It all starts with the first contact. There are several avenues through which you may have found us – our website, Facebook, or perhaps a recommendation from a friend we have worked for previously. During the first contact, we will typically discuss what ideas you may have in mind and what you are hoping to achieve. We will ask you a series of questions to help us understand exactly what you want from this renovation. After the call, we will send you a welcome email along with samples of some of our past projects. Over time, we’ve found that clients found our portfolio to be a valuable resource when planning their renovation. This call helps us decide if we are a good fit, and if your budget is enough to make your dreams a reality.

2. Site visit

Next, we will organise a suitable time to meet on-site to discuss the project and get to know each other. The site visit allows us to thoroughly evaluate the scope of the project and understand exactly what you want from the renovation. We then complete our comprehensive estimate sheet which takes everything into account so that our quote is highly detailed, and there are no surprises for you at the end. How often have you heard horror stories from your friends about the experiences they suffered through when they built or renovated? This is not acceptable to us. Our fixed price quote has been proven over time to be as accurate as they can possibly be. It’s a quote you can fully rely on, with no hidden costs. Variations will only result from the changes you make during the renovation or from any repair work we find during the process that needs repairing. While on-site, we will take several photographs and measurements.

On many occasions, clients are looking for a new layout and a more functional room. In recent times, we are finding that more clients are choosing to remove baths entirely and opt for a large walk-in shower. This visit also presents an excellent opportunity to share our experience and knowledge to help you with the decision making. Every job is different; we find that bathrooms that are on bearer and joist timber floors can have the complication of rot in the timbers if the shower has been leaking for a while. If access permits, we can get under the house and inspect the subfloor area, take some photos, and discuss our findings with you. It is also during this stage that we assess the property to see if it was built with asbestos products. Using asbestos products for building was stopped in the 1980s. If it so happens that your house was built in that era, we will retrieve a sample out of a wall and send it to a lab to have it undergo a comprehensive test. Asbestos is a toxic material, and there are extremely strict rules and protocols while dealing with it.

3. Quote Preparation

After the site visit, we aim to have the quote back to you within five days. Our quotes are very detailed and comprehensive. It typically includes all the inclusions, allowances, and exclusions, as well as a detailed scope of works. Some items have a PC (provisional cost) rate allocated to them. These are items where you may spend more than the allowance or save money and spend less. The PC items are included in the quoted total. The items we usually PC are plumbing, electrical, and the inclusions to the bathroom. We use only the best quality products that have been proven to last from our many years of experience. We stay away from inferior products that don’t last. In our industry, you get what you pay for.

An example of this is a toilet. You can buy one at Bunnings for $220. Or you can buy a good quality Caroma for $700. They may look similar, but time will tell as the cheaper one doesn’t always last. Therefore, it is in your best interests that only top quality products are procured and installed.

4. Finalising the deal

This is when all the fun begins!

  1. We put your bathroom renovation into our schedule.
  2. We prepare all the necessary paperwork, including a HIA contract.
  3. An invoice will be presented for a 10% deposit, which is required after signing the contract.
  4. If the project is over $20,000, we will provide you with Homeowners Warranty insurance. This will be included and clearly specified in the quote. This isn’t something that all renovators offer, but it is something that we do for our clients.
  5. A visit to Milligans Shower Screens is also suggested so you can look at the various shower screen and mirror options available.
  6. Tile selection can be made at Tilepower Forster or Taree. We can introduce you to them in the shop, or you can decide to go in on your own.

THE CONSTRUCTION

Step One: Preparation

Preparation is key.

  • First, we remove all your valuables and wall hangings before we start, so they don’t get damaged during the renovation.
  • Next, we install covers along the walkway to the room to contain the dust and protect the floor coverings.
  • The room is usually demolished on the first day of the project; the room will often look something like the photo in figure 1.
  • We use demolition hammers that have vacuum fittings. They are amazing because they catch much of the messy dust.

Step Two: Repairs

The second phase of the demolition usually starts on the second day. This is when the plumbers and electricians come and do their part. It is when the room is in this state that we will be able to investigate to see if there is any water or termite damage and make any repairs where necessary. These repairs, if major, will initiate a valuation for approval. However, if only minor repairs are needed, it will be done at no extra charge. This ensuite bathroom below in figure 2 had extensive damage. The shower was about to fall in with the client along for the ride.

Step Three: Plumbing and Electrical rough-in

The length of time this takes will vary depending on what you decide to do with the layout and inclusions. When clients change the layout of the room, there is a lot of plumbing required in preparing for the plasterboard. Electrical work can be quite involved as recent trends show more clients are now installing:

  • LED lights connected to sensor lights under the vanities
  • Underfloor heating
  • Power points in their shaving cabinets to charge the toothbrush or shaver
  • Pendant feature lights
  • Senor lights to the room so that the visit during the night can be easier.

The carpenters need to prepare the frames and floor for the plasterer. The walls need to be straight so that the tiles sit nicely on the wall. Many old homes need a lot of frame prep as they are often out of plumb.

Step Four: Plastering

The plasterer comes in and sheets the walls and ceilings to prepare it for waterproofing. We find that many clients are choosing to tile up to the ceiling, meaning there is no need for a plaster cornice. Square set cornice looks modern and sharp in the bathroom and a finish I will usually recommend.

Figure 4 illustrates how we create the tiled Niche’s in the walls. They are waterproofed and they provide functional storage solutions. Also, they look fantastic when a feature tile is used.

Step Five: Waterproofing

This is the waterproofing stage. Figures 5 and 6 show the various stages of the waterproofing process. First, we waterproof the floor; then, we waterproof the sand cement bed to provide added insurance against leaks in the future. Notice the floor waste has been recessed? This allows the tilers to install a smart tile floor waste, which blends into the tiles. These are our preferred waste; we use them whenever we can.

Step Six: Wire Reinforcement

The next step is to install a wire reinforcement in the sand-cement bed. This is only done when working with timber floors. It is an extra precaution we take to avoid cracking and movement as time goes on.

Figure 7 shows the shower recess; you can see the aluminium angle that is the shower recess waterproofing angle. This is sealed to the floor to contain the water from the shower and sits under the shower screen.

Step Eight: The shower screens and mirrors

Many clients prefer as little glass as possible to avoid the cleaning glass requires. We are finding that walk-in showers are extremely popular.

There are three styles of screens.

  1. Framed screens: This is the cheapest option; the frame is around each panel of glass. Some find this hard to clean.
  1. Semi-Frameless. This option has a frame to the top and the bottom of the glass panels. This looks slightly like a frameless screen.

iii. Frameless.This is the premium option.They do look stunning; however, they cost nearly double the cost of framed screens.

The shower recess below has the Niche’s in the wall for your footrest and also a place to store your bottles. The floor waste is a smart tile waste which conceals the floor waste nicely.

This shower has a frameless screen.

This wall-hung vanity has LED lighting under it; attached to it, we have a sensor light. This allows you to be able to easily navigate the bathroom at night. The nice subtle light automatically comes on every time someone enters the room.There are so many great new modern ideas to make your bathroom special–as well as practical.

Step Nine: Painting

At this stage, the painter comes in and paints where required. We usually have new architraves and doors that may need replacing. Depending on the age of the room, we will sometimes paint the ceiling of the bathroom too. We have had occasions where our clients have asked that we paint more of the house while we were there. This is never a problem.

Step Ten: Professional Cleaning

We employ the services of our professional cleaner to come in and clean the bathroom and the adjoining rooms. The rest of your home will not require much cleaning as we take steps to ensure a clean site throughout the process. We use jackhammers that have vacuums attachments; this helps us minimise the dust spreading through your home. It is at this stage that you begin to see and experience the value of your investment. Bathrooms are such an integral part of our lives and homes. And like a new kitchen, they are worth the investment and contribute largely to the value to your home.

WHAT PEOPLE ARE SAYING!

MEET THE OWNERS & THEIR STORY

Bob, Steve and Brett Nelson have all been part of the business over the last 30 years. We have been making dreams come true for hundreds of clients and continue to do it everyday. Our work covers small bathroom renovations to million-dollar new home builds; which means we have the experience to ensure you get the quality result you are after.

We have the systems, trades, and knowledge to make your dreams happen seamlessly: no hassles and “On Time As Promised”. I invite you to take me to read the reviews in this e-book and check out our website www.bsnelson.com.au